文章摘要
曹新明,王建珍.北京市阳光广场降水与锚拉护坡桩工程施工设计及工艺[J].地质与勘探,1995,(2):51-54
北京市阳光广场降水与锚拉护坡桩工程施工设计及工艺
Construstion Design and Technology of Drawdown and Anchored Slope Proteotion Pile Eegineering in Sunlight Plaza of Beijing City
  
DOI:
中文关键词: 降水 锚拉 护坡桩 深基础 工程施工
英文关键词: deep foundation pit and large area,drawdown and anchored slope protection pile
基金项目:
曹新明  王建珍
冶金部第一地质勘察基础工程公司
摘要点击次数: 2035
全文下载次数: 1199
中文摘要:
      阐述了深基坑大面积基础工程的降水与护坡的设计原理,成井灌注桩施工工艺及实际应用效果,为深基坑大面积降水和锚拉护坡桩工程的进行提供了参考依据。
英文摘要:
      n deep foundation pit and large area foundation engineering,the design principle of drawdown and anchored slope protec-tion,the working technology of well completion poured pile and its applications are presented, which is of reference value to en-gaging in the deep ground pit and large area drawdown and anchored slope protection engineering.
查看全文   查看/发表评论  下载PDF阅读器
关闭