文章摘要
周武阶.夯扩桩沉管控制贯入度计算法[J].地质与勘探,1998,(5):53-55
夯扩桩沉管控制贯入度计算法
CALCULATION OF PENETRATION CONTROLLED BY IMMERSED TUBE FOR RAMMER-REAMED PILE
  
DOI:
中文关键词: 沉管控制 贯入度 夯扩桩 闭口钢管桩 承载力
英文关键词: penetration controlled by immersed tube,standard value for vertical ultimate bearing capacity of single pile,rammer-reamed pile,closed steel pile
基金项目:
周武阶
冶金部中南勘察基础工程总公司
摘要点击次数: 1698
全文下载次数: 1218
中文摘要:
      通过改造格尔谢万诺夫打桩公式,提供了夯扩桩沉管控制贯入度计算表达式,在此 ,介绍了沉积控制贯入度在夯扩桩设计和施工中的用途,并举例验证。
英文摘要:
      A calculation formulation of penetration controlled by immersed tube for fammer-reamed pile was proposed by means of revising Geer Xiefannuofu piling formular,and its use in the designing and construction of rammer-reamed pile was introduced.
查看全文   查看/发表评论  下载PDF阅读器
关闭